| Building Performance Measurements: |
The performance measurements of a building at any time building occupants are present, where temperature, humidity, and ventilation must be controlled. Education Note: Most buildings will have three or four performance measurements for temperature, humidity and ventilation. When occupants are in the building during weekdays, where most, if not all, of the building is occupied; when occupant loads are down, usually after 5 PM weekdays; nighttime performance when the building is unoccupied except for janitorial cleaning; and weekends and holidays when the building is normally empty. Building performance is an emergency efficiency control measurement. |